How Fast Can a New Setting-Out Team Mobilise Onto a Piling Programme?
A piling rig can’t wait for a slow handover. What actually determines fast, competent mobilisation onto a piling programme — and the questions worth asking before you need cover urgently.
Piling Setting Out on UK Construction Projects — What It Involves and Why Accuracy Matters
Piling setting out positions every pile to the design as the rig works. Accurate, independently checked set-out avoids rig standing time, remedial piles and redesign — and an as-built survey keeps the foundations defensible.
Top 5 Mistakes to Avoid in Site Engineering
Mistakes in site engineering can delay projects and increase costs. This guide breaks down the top 5 issues we see on site—and how to avoid them with clear, practical steps. A must-read for project managers, engineers, and construction students.
CICES vs. RICS in Surveying and Construction: Which Is Right For Your Career?
IWhen planning your career path in surveying and construction, two major professional organisations tend to come up in conversation - CICES and RICS. Based on our experience working across numerous construction projects in Hertfordshire and surrounding counties, we've put together this straightforward comparison to help you decide which membership would benefit you most.

