Understanding Pot-Ended & Abandoned Cables: Why They’re Almost Impossible to Detect (And What That Means for Your Site)
Pot-ended and abandoned cables are some of the hardest buried services to identify. This blog explains why standard detection methods can’t locate them, what this means for PAS 128 surveys, and how project teams can plan safer excavations despite these limitations.
Cut, Fill, Done Right: How Volume Analysis Saves Time and Money
Volume analysis plays a vital role in managing construction projects. It reduces the risk of over-excavation and underestimation, optimising both time and costs.
Choosing the Right Survey Partner: What to Ask Before You Break Ground
Before you break ground, are you sure what lies beneath? From PAS 128 standards to survey turnaround times, here’s what every PM should ask before hiring a utility surveyor.