What Is a GPR Survey and How It Fits Into PAS 128 (UK Guide)

Most clients ask for a 'GPR survey' when what they actually need is PAS 128 detection. This guide explains what GPR can and can't do, how it fits into Type B investigations, and what a proper survey pack should include.


Read More

How Long Does a Full Utility Survey Typically Take – and When Should It Be Scheduled?

Utility surveys are one of the simplest ways to de-risk excavation, drainage or piling — but only if they’re scheduled early. In this guide, we break down how long a full PAS 128 utility survey really takes, what happens on-site vs during CAD processing, and when it should sit within your programme to avoid redesign, service strikes and stand-down costs.






Read More